FHA/VA/HUD Foundations

Manufactured home certifications and repairs. Fast, code-compliant, closing‑friendly.
★★★★★ "Foundation certification was done right. My lender had everything they needed within 48 hours." – Realtor, Peoria AZ ★★★★★ Great team. Explained everything, fixed our crawl-space issues, and left the site spotless."– Homeowner, Glendale AZ ★★★★★ “HUD foundation report delivered fast. They coordinated with the lender and kept us informed.” — L. Sanchez, Glendale ★★★★★ “Professional and fast. They handled my insurance claim without me chasing anyone.” - Homeowner, Surprise AZ ★★★★★ “Crew was polite, timelines were met, and the skirting looks great.” — T. Nguyen, Surprise ★★★★★ “Wind damage fixed in 48 hours. Insurance paperwork wasn’t a nightmare for once.” — L. Johnson, Peoria

Why Certification Matters

FHA, VA, and HUD programs require manufactured homes to sit on a permanent foundation that meets strict engineering and safety standards. Lenders will not fund without proof. That proof is a written certification stating the foundation meets the current guidelines and that the home is properly anchored, supported, and protected against uplift, lateral movement, and moisture. In plain English: the home must be safe, stable, and documented.

That documentation is time‑sensitive. Most real estate contracts are racing a closing date, and every day of delay threatens the deal. Our team specializes in getting certifications and repair scopes produced quickly so buyers, sellers, and agents keep momentum. If minor fixes are needed to pass, we propose the smallest, code‑compliant solution first. When larger work is appropriate, we lay out a clear path with transparent pricing.

Outcome we aim for: a clean pass, a tidy job site, and paperwork your lender and underwriter accept on the first submission.
Completed manufactured home exterior after wind and water damage restoration by Mesic Contracting Arizona call 623-915-1447

How Our Process Works

Step 1

Site Visit & Photos

We inspect the crawl space, skirting, piers, anchoring, footings, moisture conditions, vents, and access. Clear photos document each required element so the engineer and lender have exactly what they need.

  • Measure piers, spacing, and support condition
  • Confirm anchoring, tie‑downs, diagonal bracing
  • Check grade, vapor barrier, drainage, and vents

Step 2

Engineer Review

A licensed engineer reviews the photo set and site notes. If the foundation already complies, you’ll receive the certification letter. If not, we create a minimal repair plan that brings the home into compliance quickly.

  • Same‑week turnarounds are common
  • Clear scope, materials, and pricing
  • Signed and sealed documentation

Step 3

Repairs & Certification

Our crew completes the approved scope, keeps the space clean, and sends fresh photos for final sign‑off. You get the certification packet lenders expect, with receipts and warranty info for your files.

  • On‑time, on‑budget delivery
  • Inspector‑ready photos and notes
  • Warranty and care tips included

Anchors & Tie‑Downs

We add or replace anchors, straps, and hardware to resist uplift and lateral forces. Proper bracing keeps the home stable during high winds and passing storms.

Piers & Footings

Missing or failing piers are corrected with code‑compliant components set on adequate footings. We focus on even distribution and solid bearing to prevent settlement.

Moisture & Venting

New vapor barriers, improved drainage, and correct vent sizing reduce rot, mold risk, and soft floor issues. We also correct blocked access points and damaged skirting.

Access & Safety

We ensure safe crawl access, lighting where needed, and clearances around utilities. Inspectors appreciate details that show respect for their process.

See the Difference

Even small corrections can change the inspection outcome. We often replace only what’s necessary: a handful of anchors, a short run of vapor barrier, or a few missing blocks. When the foundation needs heavier work, we stage materials and crew to move quickly without turning the yard into a construction zone. The goal is always the same: a clean pass with the least disruption and the clearest paper trail.
Tip: Ask your agent to send the lender our certification checklist upfront. That alone can save days of back‑and‑forth.
Before After

What Lenders Expect

Your certification packet includes the signed engineering letter, photo documentation, and receipts for any repairs. If the property involves flood or special soil conditions, we note the mitigation in the report.

For Agents & Title

We deliver PDFs that are easy to forward and archive. Each file is labeled with the property address and date for clean records. We can also send directly to the lender and title company.

For Homeowners

You receive a simple summary of what was found and fixed, plus care tips for the crawl space. Keep it with your closing documents. It helps on future refinances and resale.

Service Area

We serve Phoenix and the surrounding Maricopa County communities. Same‑week scheduling is common and rush appointments are available when a closing is on the line. If you’re outside this area, call anyway; we’ll confirm options or recommend a trusted partner.
Related Service: Insurance Restoration

What to Have Ready

  • Property address and agent contact
  • Preferred timeline or closing date
  • Any prior inspection notes or photos
  • Gate/lockbox instructions

What Counts as a Permanent Foundation?

A “permanent” foundation for a manufactured home is more than a line in a contract. It means the system of footings, piers, anchors, and connections that tie the home to the ground is durable, designed to resist movement, and properly transfers loads into the soil. HUD’s guidance spells out the performance goals: resist uplift, lateral, and overturning forces; control moisture; and maintain structural integrity across the home’s service life. The engineering details vary by soil, wind, and local code, but the objective is constant: safety and durability.
During our inspection we verify support spacing, pier materials, shimming, and bearing. Inadequate blocking or deteriorated wood are common findings. We also look for corrosion at anchors, missing diagonal braces, and damage from prior water intrusion. Where the crawl space is tight, we use compact lighting and low‑profile cameras so the photo set is still clear for engineering review.
Ventilation and moisture control often decide the pass/fail outcome. A simple vapor barrier and better surface drainage can prevent the musty conditions that lead to soft floors and damaged framing. We review vent count and placement, confirm access door size, and ensure utilities have safe clearances. None of this is glamorous work, but it’s the work that keeps manufactured homes healthy and lenders comfortable with the risk.
When the existing system is fundamentally sound, our scopes are intentionally small. We swap failing components, add hardware where missing, and correct moisture issues. If the original installation never met code, we present a concise upgrade path with costs and timelines. Either way, the goal is to minimize disruption, control cost, and deliver a certification packet that passes without a second round of questions.

Timelines, Pricing, and What to Expect

Most projects start with a call and a few basic questions. We then schedule a site visit. You’ll receive either a certification or a repair proposal within a few business days. If you approve repairs, we get to work. When complete, we capture fresh photos, the engineer signs off, and the final certification is issued. Throughout the process we send simple updates so everyone knows what’s next.
Pricing depends on access, scope, and material requirements. We quote a single transparent number that includes labor, materials, disposal, and documentation. If we discover a hidden condition that changes scope, we talk before we act. Surprises are for birthdays, not closings.
Need a rush? Tell us the closing date. We’ll be honest about what’s possible and help you prioritize what moves the file forward.

Common ZIP Codes We Serve

Rapid response across Phoenix and surrounding cities. Typical scheduling windows are faster inside Maricopa County.

Frequently Asked Questions

Most certifications are completed within a few business days after our site visit. Complex repairs or scheduling constraints may add time, but we’ll set expectations up front.

We propose the smallest, code‑compliant scope that achieves compliance. Once approved, we schedule repairs quickly and provide photos for final sign‑off.

Yes. We routinely share documents with lenders, agents, and title companies to keep the transaction moving.

Yes, we handle crawl‑space and foundation issues on site‑built homes as well. Ask for a quick assessment.

Yes. The signed and sealed certification is part of the deliverable when the home meets the standard.

We address flood requirements during the engineering review and include any relevant notes in the packet.

Yes. We stand behind our work. Warranty details depend on the scope and materials and are included in your packet.

We keep job sites clean and include disposal in our proposals unless otherwise noted.

Absolutely. We can coordinate access with your agent and keep you updated by text or email with photos.

We accept common payment methods and can invoice title when arrangements are made in advance.

Find Us

We’re local to Phoenix, serving Maricopa County and nearby communities. Use the map for directions or call and we’ll help you schedule a visit that fits your timeline.

Ready for a clean pass?

Get your HUD, FHA/VA, and ICC foundation certification without chaos or delays. We do the work, document it right, and keep your closing on track.